BURTON CONSTRUCTION & MAINTENANCE LTD

PO BOX 10112, ROTORUA. 3046

Ph / Fax: 07 348 2662 

COPYRIGHT

© 2014 | PRIVACY POLICY

RECENT / COMPLETED PROJECTS

Rotorua Lakes High School - Music Block

New-build construction of Music Block featuring:

- Open plan teaching space

- Practice rooms

- Recording studios

- Performing rooms with motorised bi-folding canopies  

  which allow students to perform to audiences on the

  surrounding grassed area

 

Design and coordination by Sigma Consultants, Rotorua.

Waipa Toilets

New-build construction of feature toilets at the Waipa Mountain Bike Park, Rotorua.

 

Includes full shower facilities and artwork by local artist Kereama Taepa.

Te Puia - New Waharoa

New-build construction of covered entranceway to Te Puia.

 

Constructed from pre-cast concrete with a glazed roof.  

 

Access to Te Puia had to be maintained throughout construction so care had to taken to maintain a safe and unobtrusive environment for Te Puia's staff and patrons.

TkoT Whakarewarewa

Demolition of Administration Block and other spaces.

Structural Strengthening and complete internal and external refurbishment for the main teaching block.

 

Designed and coordinated by Werner Naude of Darryl Church Architecture, Rotorua.

Redwoods Toilets

Construction of feature toilets at the Redwoods.

 

These toilets speak for themselves and are fast becoming a 'must see' destination for all visitors to Rotorua.

 

Designed by Darryl Church Architecture, featuring artwork by Kereama Taepa

Rotorua RDA - New Premises

Construction of a new covered riding arena and administration facilities for the Rotorua branch of the Riding for the Disabled.

 

A very exciting project for the RDA and one we are very proud to have been involved with.

It's a great charity, please look at their website for more information and how to donate.

Kaharoa School - Admin Building

Re-clad and remodel of the Administration Building.

 

Included full re-roof and internal fitout.  

Shrinkwrap was installed over the entire building to allow work to continue through the winter months.

WHHS - K Block and Dance Studio

Refit of K Block classrooms including kitchen facilities.

 

Construction of a specialised Dance Studio on an existing Concrete Slab.

 

Western Heights Primary School

Refit of four classrooms in Block B including associated toilet blocks.  

 

Work was completed in two stages to minimise the impact of the works on the school.

Kaharoa School - Senior Block Upgrade

Refurbishment of 4x classrooms including upgrade of toilet facilities.

 

 

Pictures of completed project to come...

Arawa Park - Rotorua Racecourse

Lift Installation & Structural Strengthening

Installation of new lift to main stand, including structural upgrade.

Rotorua International Stadium

Cladding and Roof Repairs

Re-clad and re-roof of corporate facilities - top floor of the stadium complex.  This is phase 2 of the works.

Arawa Park - Rotorua Racecourse

Re-clad and installation of new joinery to the upper level of the main stand.  This was phase 2 of the works.

Sport of Kings Motel - Peace Street

We carried out work in two stages at this Rotorua Motel.

 

Stage 1 of the works was the conversion of an existing dwelling into two separate 2 bedroom motel units/apartments.

 

Stage 2 of the works was the construction of four new motel unit.

 

 

Choices Flooring Stores

We completed the shop fit-out of four new flooring stores in Auckland, Tauranga, Hamilton and New Plymouth.

 

 

Papamoa College

We completed work at Papamoa College, this involved placing four re-locatable classrooms on to foundations, including decks, ramps and stairs.

 

 

Indian Star Express Takeaways

We have recently completed the shop fit-out of the new Indian Star Express Takeaway store, located in the Mitre 10 Mega Trade Centre on Amohau Street, next to Kmart.

 

Fiber-Fresh Reporoa

We have recently carried out an extension of a commercial premises for Fiber-Fresh in Reporoa.

 

Photos to come....

 

 

Otonga Road Primary School

We have recently completed work at Otonga Road Primary School, carrying out an upgrade of the facilities throughout the school.

 

Following the success of the above works, we completed a second project at the school - the modifications for a STEAM Lab and Resource Room, which has now been completed.

 

Photos to come....