RECENT / COMPLETED PROJECTS
Rotorua Lakes High School - Music Block
New-build construction of Music Block featuring:
- Open plan teaching space
- Practice rooms
- Recording studios
- Performing rooms with motorised bi-folding canopies
which allow students to perform to audiences on the
surrounding grassed area
Design and coordination by Sigma Consultants, Rotorua.
Waipa Toilets
New-build construction of feature toilets at the Waipa Mountain Bike Park, Rotorua.
Includes full shower facilities and artwork by local artist Kereama Taepa.
Te Puia - New Waharoa
New-build construction of covered entranceway to Te Puia.
Constructed from pre-cast concrete with a glazed roof.
Access to Te Puia had to be maintained throughout construction so care had to taken to maintain a safe and unobtrusive environment for Te Puia's staff and patrons.
TkoT Whakarewarewa
Demolition of Administration Block and other spaces.
Structural Strengthening and complete internal and external refurbishment for the main teaching block.
Designed and coordinated by Werner Naude of Darryl Church Architecture, Rotorua.
Redwoods Toilets
Construction of feature toilets at the Redwoods.
These toilets speak for themselves and are fast becoming a 'must see' destination for all visitors to Rotorua.
Designed by Darryl Church Architecture, featuring artwork by Kereama Taepa
Rotorua RDA - New Premises
Construction of a new covered riding arena and administration facilities for the Rotorua branch of the Riding for the Disabled.
A very exciting project for the RDA and one we are very proud to have been involved with.
It's a great charity, please look at their website for more information and how to donate.
Kaharoa School - Admin Building
Re-clad and remodel of the Administration Building.
Included full re-roof and internal fitout.
Shrinkwrap was installed over the entire building to allow work to continue through the winter months.
WHHS - K Block and Dance Studio
Refit of K Block classrooms including kitchen facilities.
Construction of a specialised Dance Studio on an existing Concrete Slab.
Western Heights Primary School
Refit of four classrooms in Block B including associated toilet blocks.
Work was completed in two stages to minimise the impact of the works on the school.
Kaharoa School - Senior Block Upgrade
Refurbishment of 4x classrooms including upgrade of toilet facilities.
Pictures of completed project to come...
Arawa Park - Rotorua Racecourse
Lift Installation & Structural Strengthening
Installation of new lift to main stand, including structural upgrade.
Rotorua International Stadium
Cladding and Roof Repairs
Re-clad and re-roof of corporate facilities - top floor of the stadium complex. This is phase 2 of the works.
Arawa Park - Rotorua Racecourse
Re-clad and installation of new joinery to the upper level of the main stand. This was phase 2 of the works.
Sport of Kings Motel - Peace Street
We carried out work in two stages at this Rotorua Motel.
Stage 1 of the works was the conversion of an existing dwelling into two separate 2 bedroom motel units/apartments.
Stage 2 of the works was the construction of four new motel unit.
Choices Flooring Stores
We completed the shop fit-out of four new flooring stores in Auckland, Tauranga, Hamilton and New Plymouth.
Papamoa College
We completed work at Papamoa College, this involved placing four re-locatable classrooms on to foundations, including decks, ramps and stairs.
Indian Star Express Takeaways
We have recently completed the shop fit-out of the new Indian Star Express Takeaway store, located in the Mitre 10 Mega Trade Centre on Amohau Street, next to Kmart.
Fiber-Fresh Reporoa
We have recently carried out an extension of a commercial premises for Fiber-Fresh in Reporoa.
Photos to come....
Otonga Road Primary School
We have recently completed work at Otonga Road Primary School, carrying out an upgrade of the facilities throughout the school.
Following the success of the above works, we completed a second project at the school - the modifications for a STEAM Lab and Resource Room, which has now been completed.
Photos to come....